Production Piloting

Accelerate your extrusion innovation and complete your R&D project up to 50 times faster. It is all about taking the limit only as the start. With two R&D Centers we offer a unique collaboration platform for further exploration. Because there is always a way to go beyond – be it in the performance of existing machinery, the quality of end products, the use of limited materials or ways of doing things. To put it in short – this is where the magic happens. 

Wire & Cable Manufacturing

FO_LV_ExtrusionLine_OEL40
Fiber Optics / Low Voltage Extrusion Line

Want to predict excess fiber length and shrinkage properties?

Read more
Test_Extruders_MXC60
Test Extruders

Do you search for more effortless place to make trials?

Read more
Vertical_Pilot_Line_1
Vertical Pilot Line

Interested in developing your cable production process with no risks and no interruptions?

Read more

Pipe & Tube Manufacturing

MXC_Extruder_testing
Extruder Bleed Tests

Do you need to study a polymer's processability? Or try another extrusion screw or a different size machine?

Read more
Pilot_medical_line
Pilot Medical / Special Line

Want to better understand what is slowing down your production at your factory and how to remedy it?

Read more
131209_Irrigation_line-1
Pilot Irrigation Line

Are you looking for a way to concentrate your development on dedicated equipment that's readily available?

Read more

Latest from Maillefer Blog

Technical symposium
The Spotlight is on Medical Tube
Blog - Maillefer

Exclusive venue for exchange

This year, we held a series of one-day symposiums on our medical tube development line at our R&D Center. Select groups of customers got an opportunity to exchange with industry experts and to witness live demonstrations. It is a great format that we plan to repeat for medical as well as other applications. During the series, we placed the accent on a multi-lumen construction with a Pebax® TPE elastomer, provided by Arkema. As a partner to the event, they gave insight into their grades for medical, firstly TPE for the event, as well as Polyamides PA11 & PA12 and PVDF.

Powered by the Fire Tiger - Forty Years in China
Blog - Maillefer

It was 1986 when the last Fire Tiger appeared on the Chinese calendar. That was also the year when a delegation of former Finnish colleagues joined Chinese leaders to establish local offices in Beijing and Shanghai. The foundation for expanding modern wire & cable production within China was set. Today we celebrate 40 years since the launch while recognizing the powerful symbol of the tiger – much bravery, energy, passion, and charisma.

SimFactory
Factory Optimization Through Simulation Modeling
Blog - Maillefer

Managing bottlenecks is vital for efficient production. New simulation tools cut through the uncertainty. With SimFactory, you balance production towards peak efficiency.