Best Practices for Catenary Continuous Vulcanizing

Eliminate the overuse of insulation material

On-site auditing Classroom / Theoretical training
Info package Recommendation
2 days
MV, HV and EHV cable
 
BestProductionPracticesCCV_EPL50

Unsatisfied with the geometrical quality of your cable core?

In catenary lines, the insulation is sagging away from the conductor by gravitation. This directly affects the eccentricity and roundness of the extruded cable core. The challenge is multiplied when producing HV&EHV cables with thick insulation layer. Poor geometrical quality leads to material overuse.

Description
As an extrusion innovator, Maillefer can help you control sagging in the CCV lines better. That will be done by the off-set in the crosshead, twisting of the cable core, CV process parameters and EHT. In some cable constructions, low sag compounds are applied.


Deliverables

New knowhow of the CVV process optimization and productivity consisting of:

  • Info package of the CCV and best production practices
  • One day classroom training in the office
  • One day hands-on training at the CCV line.

Latest from Maillefer Blog

Technical symposium
The Spotlight is on Medical Tube
Blog - Maillefer

Exclusive venue for exchange

This year, we held a series of one-day symposiums on our medical tube development line at our R&D Center. Select groups of customers got an opportunity to exchange with industry experts and to witness live demonstrations. It is a great format that we plan to repeat for medical as well as other applications. During the series, we placed the accent on a multi-lumen construction with a Pebax® TPE elastomer, provided by Arkema. As a partner to the event, they gave insight into their grades for medical, firstly TPE for the event, as well as Polyamides PA11 & PA12 and PVDF.

Powered by the Fire Tiger - Forty Years in China
Blog - Maillefer

It was 1986 when the last Fire Tiger appeared on the Chinese calendar. That was also the year when a delegation of former Finnish colleagues joined Chinese leaders to establish local offices in Beijing and Shanghai. The foundation for expanding modern wire & cable production within China was set. Today we celebrate 40 years since the launch while recognizing the powerful symbol of the tiger – much bravery, energy, passion, and charisma.

SimFactory
Factory Optimization Through Simulation Modeling
Blog - Maillefer

Managing bottlenecks is vital for efficient production. New simulation tools cut through the uncertainty. With SimFactory, you balance production towards peak efficiency.