Change country to:

Search results

Vertical Cable Clamp KS 160

Nearest Maillefer contacts for USA

KN Manufacturing Solutions LLC

Fiber Optic

5464 Woodrun Ct
GA 30517 Braselton

Tel: +1 678 828 9868

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza

Continuous production, minimized down time

Our cable clamp KS 160 is used in medium, high and extra high voltage cable production.

Cable Clamp KS 160.png

Description

Our accumulators are equipped with pneumatically operated clamping devices. For example, when a pay-off is placed before the accumulator, the clamp holds the incoming cable end during reel change in a pay-off. Meanwhile, the accumulator is emptied for maintaining continuous production.

Our Vertical Cable Clamp KS 160 enables vertical clamping of the cable inside the free hanging cable loop. The clamping point in vertical direction can vary between 200 - 1200 mm from floor level. This reduces the distance between the pay-off and the inlet of the accumulator, because there are no other supporting points between the inlet point and the winder. The clamp can operate inside the range of hanging cable loop that is needed by the dancer.

The clamp consists of a vertical fixed beam and a pneumatically movable clamping beam. Both beams are equipped with exchangeable rubber surfaces to ensure adequate braking friction. The clamping gap is surrounded with fences to protect the operator and outsiders. The conductor inlet is equipped with vertical guide rollers.

Technical characteristics

Cable diameter, max. 160 mm
Clamping force, max. 5000 N

Exact values depend on the assembly.

Options

  • Traverse control device

Meet us at Interwire 2021 CANCELLED! in Atlanta, GA, USA on 26 - 27 October, 2021!

IWCS 2021

Read more

Irrigation Show

Read more

Wire Düsseldorf

Read more

Wire China

Read more

Wire Southeast Asia

Read more

Wire India

Read more

From our blog Visit Blog

Stay in the Game with a H&P Value Package

14.10.2021

You may feel satisfied with your existing capacity to manufacture Heating &amp; Plumbing pipe. But how truly secure is your existing business situation? Maillefer offers value packages designed to ensure that you and your production equipment stay in the game. Read more

Stay in the Game with a H&P Value Package

State-of-the-Art Six Layers and Striping

5.10.2021

The ECH 5/50 ML earns its stripes with this new 7 extruder group version, for both smooth and corruguated tubes. Individual channels offer the flow precision and stability for each functional layer as demanded by today’s automotive industry. Read more

State-of-the-Art Six Layers and Striping

State-of-the-Art Crosshead for Tough Building Wire

21.9.2021

The new ECH 35/45 DL crosshead is designed especially for building wire applications having the toughest demands, as specified by the CPR (Construction Product Regulation). Read more

State-of-the-Art Crosshead for Tough Building Wire

State-of-the-Art Crosshead for Corrugation

9.9.2021

The ECH 3/20 single layer extrusion crosshead is for production of corrugated tubes, especially for automotive and technical applications. Read more

State-of-the-Art Crosshead for Corrugation

Realize a Winning Layout

24.8.2021

Extrusion lines come in standard layout configurations. However, is a standard layout enough? Being able to consider a specific alternative layout may make all the difference. Read more

Realize a Winning Layout

Find It in MED 3.0

10.8.2021

The latest version of the Maillefer documentation software is here, MED 3.0. The web-enabled documentation utility makes finding assemblies and related instructions easy for users of Maillefer equipment. Read more

Find It in MED 3.0

Innovate in the R&D Center

27.7.2021

Creating a development platform where together we explore the manufacturing limits in a real production environment. So far, it has proven successful to our customers and partners. Yet, there's more to come as we continue expanding. Read more

Innovate in the R&D Center

A World in Full Acceleration

14.7.2021

We are witnessing a number of factors currently driving and accelerating our business. Needed decisions that build on growth in new appearing markets are offering opportunities. The time to act is now. Read more

A World in Full Acceleration

Share by email

[object Object]