Looking for faster and safer transition into submarine cable production?
Submarine power cables have very demanding requirements. Learn about the design elements and manufacturing steps needed for high quality design and manufacturing of HV and EHV AC and DC submarine extruded cables.
This training is particularly useful for established power cable manufacturers who are looking to enter submarine cable production. The training describes the necessary design elements and manufacturing steps needed, and elaborates on the main risks associated with each of them. It also covers electrical routine testing and the mechanical testing facilities needed for reliable testing of submarine cables.
Five days of classroom training according to the technical manual
The technical report consisting of:
Please fill in your details below and we’ll get in touch!
25.5.2016
7.10.2026
The KWB is an automatic dual coiler/reeler engineered to wind tube onto Maillefer stainless steel turrets for self-supported coils or onto customer reels. It especially responds well to wind medical tube but also excels with small-diameter tube and specialty tubes. Read more
23.9.2026
At Maillefer, we don’t just deliver solutions; we forge lasting partnerships. Our House of Experts model includes the ability to strengthen ties and build upon shared journeys. It goes beyond advanced technologies. Read more
16.9.2026
Over the past 30 years, Maillefer has delivered and started hundreds of catenary continuous vulcanization (CCV) lines globally. We can confirm that successful cable quality needs a perfect interaction between all the various components in a CCV line. To that end, Maillefer and Sikora GmbH, invented a means for securing the cable quality for both past delivered CCV lines and those to be delivered in the future. They named the device Siccon 600. Read more
9.9.2026
In today’s business environment, we continuously adapt our solutions, tactics, and technologies to navigate and optimize the steps ahead. It is essential, as a leader, to shape your markets, business drivers, and the technology that enables future success. Read more
2.9.2026
The productivity of an optical cable manufacturing line can be significantly improved by increasing line speed. The buffering process has introduced entirely new limits for these speeds, making the start-up procedure increasingly important. A rapid ramp-up to production speed may generate substantial scrap before the process stabilizes. Read more
19.8.2026
KWB 600 Dual Coiler for TubeThe KWB is an automatic dual coiler/ reeler engineered to wind tube onto Maillefer stainless steel turrets for self-supported coils or onto customer reels. It especially responds well to wind medical tube but also excels with small diameter tubes and specialty tubes. Read more
5.8.2026
The insulation process of high-voltage submarine cables can be considered a complex process. In our efforts to simplify, we have brought real benefit when installing the Maillefer Round Curing technology. The theoretical and calculated results, together with R&D line testing, have now proven accurate on several VCV lines installed globally. Read more
22.7.2026
The Maillefer IV medical tube extrusion line remains our classic product. It’s what customers have long asked for. It’s what we continue to deliver – high-performance fully equipped lines, from extrusion to coiling, dedicated to produce soft intravenous tube for the big names in the industry. Yet, today’s landscape has changing. There is so much more to offer. Read more