Change country to:

Search results

Maillefer Smart Monitoring

Nearest Maillefer contacts for USA

KN Manufacturing Solutions LLC

Fiber Optic

5464 Woodrun Ct
GA 30517 Braselton

Tel: +1 678 828 9868

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza

All applications

Monitoring towards excellence

An intuitive new approach into the wire, cable, pipe and tube manufacturing environments

The Smart Monitoring concept takes shape around the Bluebox, an intelligent data collection and analysis system first released last year. As a product it is now offered in two packages, depending on the focus needed and the primary users. They are Manufacturing Floor Data and Manufacturing Floor Excellence.

Manufacturing Floor Data is an industrial system for advanced data collection and storage of all vital process parameters. It builds on data collected from the ground up and linked through many connection possibilities. Configurations treat up to 5 000 tags in real-time with a timeline limited only by disk capacity. Manufacturing Floor Data targets individual processes (e.g. one extrusion line), manufacturing cells, or entire facilities. Integration is open, easy and non-invasive, without requiring a major engineering effort to retrofit various equipment technologies. Use the historian desktop tool to view trends and make reports. Place immediate information and stored production details in the hands of operators, engineers, and operation managers.

 

Manufacturing Floor Excellence is a system package for advanced analysis and accelerated decision making. The highly visual, informative and custom tailored dashboards bring a wider understanding into the manufacturing process. Its configurations offer easy solutions to management and production personnel, plus it improves the machinery maintenance functions through Preventive Maintenance. The Preventive Maintenance module integrates the maintenance tasks schedule, descriptions, and engineering documents. Personnel get direct access to the right information to oversee and realize maintenance jobs.

Want to hear more?

Please fill in your details below and we’ll get in touch!

* Required fields

Meet us at Wire & Tube China in on 23 - 26 September, 2020!

IWCS

Plastimagen

Read more

Irrigation Show

Read more

Wire Düsseldorf

Read more

Wire India

Read more

Chinaplas

Read more

From our blog Visit Blog

The Many Faces of Consultation

3.6.2020

With Consultations, Maillefer brings the understanding of industrial engineering into play to provide an outsider’s view and to suggest real change. Read more

The Many Faces of Consultation

COVID-19 - Maillefer's Cautious Return

2.6.2020

As the peak in the global crisis passes, Maillefer engages a cautious return to the workplace. Each Maillefer facility implements actions accordingly. Read more

COVID-19 - Maillefer's Cautious Return

FPO / FTU 14 Pay-off and Take-up

27.5.2020

New in low voltage cable production: Maillefer's new FPO / FTU 14 Pay-off and Take-up. Read more

FPO / FTU 14 Pay-off and Take-up

CMB Cutter is a Welcome Arrival for Accurate Tube Lengths

22.5.2020

Maillefer's new CMB 32 cutter is specially designed to consistently deliver lengths of medical or automotive tubes. Read more

CMB Cutter is a Welcome Arrival for Accurate Tube Lengths

BICC BERCA Secures Capacity for World-class Production

13.5.2020

Maillefer installed BICC BERCA's 1st CV extrusion line in the 90’s and ensured smooth and fast project realization through several upgrades. Read more

BICC BERCA Secures Capacity for World-class Production

Big Data for Big Possibilities

6.5.2020

Maillefer welcomes smart technology as a means of taking the manufacturing process to the next level. Read more

Big Data for Big Possibilities

Synchronized X-ray Centering on a CCV Line

29.4.2020

Synchronized X-ray Centering on a CCV Line. Imagine eliminating the tedious offline centering procedure by integrating it right into the extrusion line. Read more

Synchronized X-ray Centering on a CCV Line

PM 265 Pay-off

22.4.2020

New in fiber optic cable production: PM 265 Pay-off: A high-speed motor driven fiber pay-off designed for a wide variety of fiber optic secondary coating lines. Read more

PM 265 Pay-off

Share by email