Change country to:

Search results

Dual Take-up PLC, Drive & Motor Upgrade

Nearest Maillefer contacts for USA

KN Manufacturing Solutions LLC

Fiber Optic

5464 Woodrun Ct
GA 30517 Braselton

Tel: +1 678 828 9868

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza
Your dual Take-up may be down because of an obsolete drive or motor. Don't keep your customers waiting and let your reputation suffer. Have your process requirements changed; do you need another type of reel or another type of reel handling?

Technology becomes obsolete and process requirements may change

Our dual Take-up upgrade package helps you secure reliable production by replacing the obsolete PLC control unit, spooling DC-drives and traversing servo drive and motor with modern technology. Future spare part supply and technical support for the Take-up is ensured. By replacing the obsolete or old component some additional, improved functions can be added to equipment to increase the equipment performance.

Upgrade solution

For this dual Take-up upgrade package we have seen equipment availability increase notably once the obsolete components are replaced by state-of-the technology.

What is included

  • Our upgrade package includes a new PLC replacement kit, new drive kits and in some cases motor replacement kits.

  • Installation and start-up by your own maintenance team, with the help of documentation delivered with the upgrade.

  • When required, Maillefer can also provide a turnkey upgrade delivery.

Act now!

Technical support and spare parts for the obsolete components of your dual Take-up are limited or no longer existing. We strongly recommend that you consider an upgrade as a preventive measure against long down times and sudden failure of the obsolete components. The delivery time for upgrade is 14 to 18 weeks. Maillefer Services will assist you in planning the upgrade packages for your single pay-offs or take-ups. Contact us at: services@maillefer.net

Meet us at Interwire in Atlanta, USA on 09 - 11 May, 2023!

From our blog Visit Blog

Collaboration and Partnerships are Key to Sustainable Solutions

26.1.2023

R&amp;D partnering, performance excellence throughout equipment life-cycles, and sustainable practices help nurture long lasting partnerships. Come explore the innovations and collaboration possibilities. Read more

Collaboration and Partnerships are Key to Sustainable Solutions

Changing Tides for Heating & Plumbing Pipe

24.1.2023

World events increase demand for multi-layer pipe around the globe. Maillefer provides you with the experience, the right resources, and the support to realize manufacturing excellence. Read more

Changing Tides for Heating & Plumbing Pipe

Stop by Our Booth 2023

11.1.2023

Stop by and meet with Maillefer at any of the industry events during 2023. We invite you to arrange your meeting with us before the show takes place. Read more

Stop by Our Booth 2023

State-of-the-Art Multi-layer for Heating & Plumbing

14.12.2022

The new generation multi-layer crosshead for co-extruding today’s EVOH, PE-RT and PEX materials has arrived. Its nested distributor design results in perfect layer concentricity. Read more

State-of-the-Art Multi-layer for Heating & Plumbing

State-of-the-Art Take-up & Pay-off

7.12.2022

Check out this new addition to our existing floor traversing take-up and pay-off family. It answers the demand for heavy cable carrying capacity of up to 100 tons. Read more

State-of-the-Art Take-up & Pay-off

State-of-the-Art Crosshead for Rubber

1.12.2022

Here is a perfect solution for dual-layer extrusion of rubber cables. Aim for higher speeds while avoiding premature crosslinking thanks to the DHC crosshead. Read more

State-of-the-Art Crosshead for Rubber

Achieving Excellence at Nexans’ Submarine Cable Plant

23.11.2022

Nexans’ high-voltage cable plant underwent a significant expansion to become the first plant in the USA producing for offshore wind farms. Cable roundness goes a long way to help achieve excellence. Read more

Achieving Excellence at Nexans’ Submarine Cable Plant

Keep it Running

16.11.2022

There are several thousand of Maillefer extrusion lines and components currently producing for a large range of applications. Some may be yours. Turn to us to help keep them running at optimum levels. Read more

Keep it Running

Share by email

[object Object]