Change country to:

Search results

Line Control Automation upgrade VAN

Nearest Maillefer contacts for USA

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza

KN Manufacturing Solutions LLC

Fiber Optic

325 Kentucky Court
GA 30548 Hoschton

Tel: +1 404 202 9655

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Amaral Automation Associates

Wire & Cable

1697 Warwick Ave, Suite D
RI 02889 Warwick

Tel: +1 401 405 0755

om;n.c;tio;oma;aut;ral;ama;es/;sal

Repco Industries LLC

Wire & Cable

13299 W. Essex Ln.
Illinois 60142 Huntley

Tel: +1 847 802 4315

Cell: +1 847 274 9218

com;es.;tri;dus;oin;epc;s/r;otu;nli

Southern Industrial Equipment

Wire & Cable

2708 Cambridge Way
TX 75092 Sherman

Tel: +1 281 844 4260

Fax: +1 903 813 0285

net;ns.;tio;olu;ons;usi;xtr;y/e;tro
Your line risks a complete shut down because of obsolete line control technology. Don't keep your customers waiting and let your reputation suffer.

Technology becomes obsolete and process requirements may change

Why would one consider an upgrade of their line control? Technology changes almost daily, whether we like it or not. Maybe an electronic part is no longer available, or there are growing incompatibilities with your working environment, or the maintenance effort is becoming unacceptable. Automated manufacturing equipment requires technology to function. So, don’t let obsolescence become a handicap to performance or have it suddenly stop your production. Modern technology allows also better production control and data evaluation for production and maintenance needs.

Upgrade solution

We can help you upgrade your line controls with modern components. By preparing for an automation upgrade with us, you help secure future equipment availability. Our upgrades offer equivalent or even improved features. Turn to us for assistance in identifying the obsolescence risks and the improvement opportunities.

What is included

  • Tailor made upgrades from S5 PLC to S7 / TIA Portal

  • Process Supervisor Unit or Operating panel upgrade to extend your equipment lifetime and to have the latest application developments in use

  • Critical item upgrade for improved reliability, functionality and lower operational costs

  • Skilled engineering and commissioning with minimum disturbances of your production

  • Peace of mind for spare parts and technical support

Act now!

Technical support and spare parts for the obsolete components of your original operating panels, PLCs, electrical components etc. are limited or no longer existing. We strongly recommend that you consider an upgrade as a preventive measure against long down times and sudden failure of the obsolete components. The delivery time for upgrade is 16 weeks. Maillefer Services will assist you in planning the upgrade packages for your line control. Contact us at: [email protected]

Meet us at Wire Dusseldorf in Düsseldorf, Germany on 15 - 19 April, 2024!

ChinaPlas

Read more

NPE

Read more

Wire China

Read more

IWCS

Read more

Wire India

Read more

From our blog Visit Blog

When Selecting an Extrusion Screw Becomes a Sustainable Choice

22.2.2024

There's a choice to be made when balancing screw performance to processing requirements. A perfect set of screw parameters may translate to energy savings Read more

When Selecting an Extrusion Screw Becomes a Sustainable Choice

Taking the Turn with Tubes for EV

12.2.2024

The move from Internal Combustion Engine (ICE) vehicles towards ones driven by alternative energy sources is in full swing. Nations have targeted a complete phase out in 2050 with an end for all new cars in 2035 (i.e. the Declaration of Glasgow). Several countries have undertaken more aggressive measures to accelerate the transition, notably Norway and Singapore. Hybrid, battery and fuel cell Electric Vehicle (EV) production is gearing up in factories around the world. The arrival of the new technology is sending waves of change along the entire supply chain. Read more

Taking the Turn with Tubes for EV

Davis-Standard successfully completes acquisition of ETG

31.1.2024

Read more

Davis-Standard successfully completes acquisition of ETG

State-of-the-Art-Highlights-Crosshead

24.1.2024

Extrude small diameter fluoropolymer medical tubes with this new model ECH 5/10 F crosshead. Precision, quality and long production runs qualify this component. Read more

State-of-the-Art-Highlights-Crosshead

We Build a Sustainable World

18.1.2024

Our innovations allow customers to do “more with less”, which is fundamental in building a more sustainable world. It's all about succeeding in the transition and how it applies to the ability to operate with social responsibility. Read more

We Build a Sustainable World

It's Time to Meet - Stop by Our Booth

16.1.2024

Stop by and meet with Maillefer at any of the industry events during 2024. We invite you to arrange your meeting with us before the show takes place. Read more

It's Time to Meet - Stop by Our Booth

Will Smart Cable Factories House Mini Data Centers?

27.12.2023

We see AI within factories as essential for further developments in quality control. Getting the needed calculating power is where fog computing comes into play. Read more

Will Smart Cable Factories House Mini Data Centers?

Our Ambition to Build a Better Tomorrow is Driving Our Business

15.12.2023

The momentum is gaining in all Wire &amp; Cable and Pipe &amp; Tube segments. Sustainability is firmly guiding Maillefer's choices daily on how we operate and run our business. Read more

Our Ambition to Build a Better Tomorrow is Driving Our Business

Share by email

[object Object]