Change country to:

Search results

Process Supervisor Unit Hardware Upgrade

Nearest Maillefer contacts for USA

KN Manufacturing Solutions LLC

Fiber Optic

5464 Woodrun Ct
GA 30517 Braselton

Tel: +1 678 828 9868

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza
Obsolete process supervision technology is putting your line at risk of a complete shut down. Don't keep your customers waiting and let your reputation suffer.

Technology is obsolete

Since fast technological evolution as well as obsolescence is affecting the main IT component of the Process Supervisor Unit (PSU), we have to inform you that the industrial PSU computer hardware is no longer manufactured. Repair and standard exchange of the computer hardware is also no longer possible.

Upgrade solution

Maillefer has selected a new PSU computer hardware, in use in today's manufactured line controls. This computer is adapted to run your PSU application version 5 as well as version 3 with minor adaptations. PSU application version 4 (under Win NT) will be upgraded to version 5. This is the latest compatible version with your line control. up to date industrial computer hardware, secure your production and minimize hardware failure risks

What is included

  • Industrial computer hardware is delivered with it’s accessories (mouse, keyboard) and mechanical adaptation kit if required.

  • Your PSU application will be preloaded as part of the system set-up and tested prior delivery.

  • Upgrade of the PSU application from previous version 4 to 5 is mandatory, and will be included in the package.

  • Optional upgrade to the latest PSU version 6 is available. It will require the adaptation of the line PLCs communication interfaces.

Act now!

As repairs and parts replacement for the PSU computer are no longer available we strongly recommend you to consider the preventive replacement hardware. The standard delivery time can reach 12 weeks. In some cases it is 3 weeks for a hardware upgrade, and 6 weeks for hardware & PSU 5 upgrade. Maillefer Services will assist you in planning the upgrade of your PSU system. Contact us at: csuvan@maillefer.net or csuecu@maillefer.net

Meet us at Plast Alger in on 09 - 11 March, 2020!

Wire Düsseldorf

Read more

Chinaplas

Read more

Wire & Tube China

Read more

IWCS

Wire India

Read more

From our blog Visit Blog

AI Invests Our Product Portfolio

12.2.2020

Solutions in Artificial Intelligence are developing rapidly and have invested our product portfolio. We employ the latest AI technology to help our customers create value from their data. The core of AI lies in automated information extraction. Read more

AI Invests Our Product Portfolio

Sustainability Here and Now

5.2.2020

As the biggest plastics event took place in Germany, the question of where we stand in terms of sustainability has grown in importance. Where to begin? Maillefer looked at different functions within its organization and surprisingly realized that certain progress has been made. Read more

Sustainability Here and Now

Astonishing Curing Calculation for Flexible Factory Joints

29.1.2020

Flexible vulcanized joints (FVJ) also known as flexible factory joints are typically used in extending delivery lengths of extruded subsea cables. Lengths of XLPE insulated cable core are often limited by the capacity of extrusion, degassing or basket lay-up. Factory joints overcome these constraints. Read more

Astonishing Curing Calculation for Flexible Factory Joints

Happy Chinese New Year!

23.1.2020

Wishing Happy Chinese New Year 2020 Read more

Happy Chinese New Year!

Composite Pipe Production Doubled without trouble

22.1.2020

Since two decades, Maillefer has been providing production systems for manufacturing multi-layer composite pipe with diameters ranging from 14 to 32 mm and from 16 to 63 mm. Today, our two model lines, the PCL32 and PCL63 that cover the two size ranges have evolved much. We are closer to 60 m/min, which first presented serious challenges to polymer and aluminum tape suppliers. Read more

Composite Pipe Production Doubled without trouble

Look Dashing with a Bluebox

15.1.2020

What is the Bluebox, and why blue in particular? Industry 4.0 has passed through here and with it a fresh way of looking at and consolidating information coming from your factory floor. Read more

Look Dashing with a Bluebox

New in EHV cable production

13.1.2020

Two X-ray gauges are used in CV lines to measure thicknesses, concentricity & diameter during production of MV, HV and EHV cables. Now, the second gauge at the cold end (after end seal) is orientable to give a synchronized visual of measurements taken by the 1st gauge at the hot end. Read more

New in EHV cable production

Season's Greetings

19.12.2019

Wishing You Happy Holidays and a Successful New Year 2020! Read more

Season's Greetings

Share by email