Change country to:

Search results

Process Supervisor Unit Upgrade

Nearest Maillefer contacts for USA

Maillefer North America

Pipe & Tube

Phipps Bend Industrial Park<br /> 402 Phipps Bend Road
TN 37873 Surgoinsville

Tel: +1 423 817 2440

Fax: +1 423 212 0131

om;a.c;rus;efe;ill;/ma;jon

Maillefer North America

Wire & Cable

#1 Extrusion Drive
CT 06379 Pawcatuck,

Tel: +1 920-215-6628

om;d.c;dar;tan;s-s;avi;w/d;cho;jza

KN Manufacturing Solutions LLC

Fiber Optic

325 Kentucky Court
GA 30548 Hoschton

Tel: +1 404 202 9655

Cell: +1 404 202 9655

com;ol.;nms;n/k;ine;iem;i.n;kar

Amaral Automation Associates

Wire & Cable

1697 Warwick Ave, Suite D
RI 02889 Warwick

Tel: +1 401 405 0755

om;n.c;tio;oma;aut;ral;ama;es/;sal

Repco Industries LLC

Wire & Cable

13299 W. Essex Ln.
Illinois 60142 Huntley

Tel: +1 847 802 4315

Cell: +1 847 274 9218

com;es.;tri;dus;oin;epc;s/r;otu;nli

Southern Industrial Equipment

Wire & Cable

2708 Cambridge Way
TX 75092 Sherman

Tel: +1 281 844 4260

Fax: +1 903 813 0285

net;ns.;tio;olu;ons;usi;xtr;y/e;tro
Obsolete process supervision technology is putting your line at risk of a complete shut down. Don't keep your customers waiting and let your reputation suffer.

Technology becomes obsolete and modern technology allows better process control and data evaluation for production and maintenance needs

Since fast technological evolution as well as obsolescence is affecting the main IT component of the Process Supervisor Unit (PSU), we have to inform you that the old industrial PSU computer hardware is no longer manufactured

Upgrade solution

Maillefer has several PSU upgrade packages available depending on customer application

What is included

  • Up-to-date Industrial computer hardware with latest software components. Accessories (mouse, keyboard, display, printer) and mechanical adaptation kit, if required, are also delivered

  • Your PSU application will be preloaded as part of the system set-up and tested prior delivery

  • Skilled engineering and commissioning with minimum disturbances of your production

  • Peace of mind for spare parts and technical support

Act now!

Some original computers and their hardware are no longer available. We strongly recommend that you consider an upgrade of those electrical items as a preventive measure against long down times and sudden failure of the obsolete components. The typical delivery time for upgrade is 12 weeks. Maillefer Services will assist you in upgrade planning. Contact us at: [email protected]

Meet us at Wire China in Shanghai, China on 25 - 28 September, 2024!

IWCS

Read more

Wire India

Read more

From our blog Visit Blog

A Growing Choice of Pipe Winding Solutions

17.7.2024

The KWS, KWI for profile, and TUT join the family of coilers / reelers / take-ups best suited for winding pipe, tube and profile. They offer the right fit for the right job. Read more

A Growing Choice of Pipe Winding Solutions

State-of-the-Art Take-up

10.7.2024

This new compact take-up is designed especially for small fiber optic jacketing lines. The machine is optimized for light weight and flexible products like drop cables and premise cables. Read more

State-of-the-Art Take-up

Master More with Less – Feel the Magic

10.7.2024

Maillefer is proud to drive changes taking place in our industry. It feels like magic, filled with excitement, when innovations are at their best! Master more with less. Read more

Master More with Less – Feel the Magic

TIG or Laser - Both Work for Multi-layer Pipe

3.7.2024

Maillefer proposes both aluminum butt welding techniques in its offering. Ultimately, it’s the customer’s local conditions and particular situation that helps make the choice. Read more

TIG or Laser - Both Work for Multi-layer Pipe

Sustainable Factors for Efficient Cable Production

19.6.2024

An extrusion process involves various factors to minimize environmental impact and resource consumption. Maillefer favors exchange that focus on maximizing efficiency. Read more

Sustainable Factors for Efficient Cable Production

Is Your Line Control Living on the Edge?

12.6.2024

Critical S5 PLC components are proving to be nearly impossible to find anywhere on the world’s markets. Are you ready to face the increasing probability of a breakdown? Read more

Is Your Line Control Living on the Edge?

Insight into Multi-layer Flow Distribution

6.6.2024

Stack-up your chances when co-extruding. Formulations and rheology are a moving target. An analytical approach means offering more than just extrusion equipment. Read more

Insight into Multi-layer Flow Distribution

State-of-the-Art Head Crosshead

29.5.2024

Be ready with this perfect solution for medium- and high-voltage PP insulated cable production. Short residence times and streamlined flow channels are just the beginning of what this crosshead offers. Read more

State-of-the-Art Head Crosshead

Share by email

[object Object]