Change country to:

Search results

Quick Conductor Splicing Value Package for HV/EHV CV Lines

Our Quick Conductor Splicing Value Package allows quick conductor splicing for compact round stranded medium voltage (MV) conductors and high voltage (HV) Milliken conductors up to 3000 mm².

Would you like to have faster and more reliable conductor splicing in the XLPE insulation process

Quick conductor splicing in just 1 - 2 minutes

With our Quick Conductor Splicing Value Package there is no need to slow down the line for reel change. Splicing can be done during the pay-off reel change. In addition there is no need for an accumulator if Milliken conductors are used, and absolutely no line stops will occur due to joint breaks.

What you get

Quick and reliable conductor splicing during pay-off reel change

  • Splicing know-how and drawings for precise specially designed conductor splicing sleeves
  • A movable hydraulic crimping machine

New lines compatible with Quick Conductor Splicing Value Package for HV/EHV CV Lines

Meet us at Wire Düsseldorf - CANCELLED in on 07 - 12 December, 2020!

Wire India

Read more

Chinaplas

Read more

Wire Russia

Read more

From our blog Visit Blog

Smart Buffering Brings Production to New Levels

2.12.2020

Smart Buffering is an invaluable tool that leverages the fiber optic buffering line's operation and efficiency to new levels. Read more

Smart Buffering Brings Production to New Levels

Working Hand-in-Hand for More Than 25 Years

25.11.2020

Emtelle and Maillefer have been working together since 1993 on blown fiber micro-duct manufacturing solutions. Read more

Working Hand-in-Hand for More Than 25 Years

Key Validation Procedures for Extruded HVDC Cable Joints

18.11.2020

Cable joint connections are crucial. Depending on the application and the lengths produced, Maillefer recommends different joint making solutions. Read more

Key Validation Procedures for Extruded HVDC Cable Joints

The Opportunities of Change

11.11.2020

Change is an opportunity to make something great. At Maillefer too. For many reasons, 2020 has certainly been a year where change is everywhere. Read more

The Opportunities of Change

wire 2020 for Customers and Partners

4.11.2020

This year's events are impacting how we operate our businesses. Important exhibitions are cancelled. wire 2020 in Düsseldorf is not happening. Read more

wire 2020 for Customers and Partners

Coilers Keep It Together

19.8.2020

Keeping extruded pipe or tube together is what Maillefer coilers are about. Dual coiling, safe fully auto transfers, and ergonomic handling are built in. Read more

Coilers Keep It Together

MPC Puller / Cutter is a Winning Combination

5.8.2020

The MPC 14 combines both the pulling and cutting operations. This puller / cutter is ideal for medical extrusion lines producing small diameter tubes. Read more

MPC Puller / Cutter is a Winning Combination

Think SMART - Act SMART!

24.6.2020

Smart Manufacturing is a step changer. Maillefer brings smart technology and plenty of new innovative equipment to Wire Düsseldorf and Wire China. Read more

Think SMART - Act SMART!

Share by email

[object Object]