Change country to:

Search results

Round Value Package Premium

Optimal roundness is essential for efficient use of insulation material on a CV line. Cutting down material overuse is one of the biggest contributors to production productivity in pre-molded and pre-fabricated joints and terminations as well.

Up to €500k in material savings per year

Would you be interested in 20% higher line productivity?

Our new patent pending roundness technology has enabled material savings of up to €500k per year in lead jacketed submarine cables. Excellent roundness makes the construction of cable joints much easier, but also improves the longitudinal water tightness between the lead sheath and cable core. The technology is proven in our Vertical Pilot Line with several HV and EHV cable constructions up to 500 kV.

What you get

Our Round Value Package Premium is tested with more than 25 strictly controlled and comparable trials. The new revolutionary curing technology increases VCV line curing capacity and simultaneously improves HV and EHV cable core roundness.

  • 20 - 50% more productivity
  • Excellent cable core roundness and increased product quality
  • Material savings in insulation and jacketing up to 500 k€ per year

New lines compatible with Round Value Package Premium

Meet us at Chinaplas in on 03 - 07 August, 2020!

Wire & Tube China

Read more

IWCS

Wire India

Read more

Wire Düsseldorf

Read more

From our blog Visit Blog

Stop by our booth

8.4.2020

Stop by at a Maillefer booth at any of the industry events during 2020. Read more

Stop by our booth

COVID-19 - Stay Safe and Keep Healthy

2.4.2020

The global crisis has temporarily changed Maillefer’s way of serving W&C & P&T manufacturers. We adapt daily according to the situation as it develops. Read more

COVID-19 - Stay Safe and Keep Healthy

Monitoring Towards Excellence

25.3.2020

In the context of Industry 4.0, Maillefer introduces Smart Monitoring as a novel and intuitive approach into the wire, cable, pipe and tube manufacturing environments. Read more

Monitoring Towards Excellence

Increase Engineering Support for Your Future Plant Project

19.3.2020

Construction of new facilities or important expansions of existing ones all begin with a promising idea. Are you ready to face the project challenges and the unexpected? Read more

Increase Engineering Support for Your Future Plant Project

COVID-19 - A Challenge to Overcome

18.3.2020

The evolving global health crisis, which we all face, is temporarily causing Maillefer to adapt its operations, sales and service response teams. Read more

COVID-19 - A Challenge to Overcome

Castello Increases Flexibility to Deliver through Smart Monitoring

4.3.2020

Castello relies on an advanced and controlled process to produce tubes with high quality. The recently installed Smart Monitoring from Maillefer provides the Italian company with necessary oversight for quality Read more

Castello Increases Flexibility to Deliver through Smart Monitoring

Multipurpose Lines Help Lead the Way for PP Cable

28.2.2020

One of the new trends in power cable manufacturing is the rise of PP (polypropylene) based thermoplastic materials for the medium voltage application. Currently, these cables are predominantly XLPE and rubber, but now advances in material development make it possible to also consider thermoplastics. Read more

Multipurpose Lines Help Lead the Way for PP Cable

Run Times Reach New Heights

26.2.2020

The performance of extruded high voltage XLPE insulated cables is improvable by reducing the degassing burden and realizing longer extrusion run times. Development towards those goals was rendered possible after years of close technical collaboration with material suppliers and cable manufacturers. Read more

Run Times Reach New Heights

Share by email