Change country to:

Search results

Continuous Type Change Value Package for MV CCV Lines

It is possible to produce several medium voltage cores in the same run without stopping the continuous vulcanization line. This significantly reduces overall downtime, especially if the production contains frequent type changes. Continuous Type Change Value Package, which you can upgrade to without heavy investment, is an effective means to improve productivity.

Would you like to remarkably save downtime and material in your MV cable production?

Your answer to frequent type changes

With our Continuous Type Change technology, change times are reduced from 2 - 3 hours to 2 - 3 minutes. Get greater productivity and cost savings especially in short production lengths and frequent type changes. Using your manufacturing data as basis, we can calculate the added value our Continuous Type Change Value Package will bring to your business.

What you get

Our Continuous Type Change Value Package increases line availability and saves significant amounts of conductor and XLPE compounds. It also reduces scrap handling, and the use of nitrogen and electricity.

  • Continuous Type Change enables you to change from one core to another while retaining production speed and without depressurizing the tube
  • Changeover scrap is very limited

New lines compatible with Continuous Type Change Value Package for MV CCV Lines

Meet us at Wire & Tube China in on 23 - 26 September, 2020!

IWCS

Elastomer Summit

Read more

Irrigation Show

Read more

Wire Düsseldorf

Read more

Silicone Elastomers

Read more

Plastimagen

Read more

Wire India

Read more

Chinaplas

Read more

From our blog Visit Blog

Think SMART - Act SMART!

24.6.2020

Smart Manufacturing is a step changer. Maillefer brings smart technology and plenty of new innovative equipment to Wire Düsseldorf and Wire China. Read more

Think SMART - Act SMART!

The Many Faces of Consultation III

17.6.2020

Maillefer is more than a classic equipment provider, refresher on IV tube extrusion is one of its consultation services proposed. Read more

The Many Faces of Consultation III

The Many Faces of Consultation II

10.6.2020

Maillefer is more than a classic equipment provider. Know-how, value and relationships extend beyond hardware in each and every Consultation case. Read more

The Many Faces of Consultation II

The Many Faces of Consultation

3.6.2020

With Consultations, Maillefer brings the understanding of industrial engineering into play to provide an outsider’s view and to suggest real change. Read more

The Many Faces of Consultation

COVID-19 - Maillefer's Cautious Return

2.6.2020

As the peak in the global crisis passes, Maillefer engages a cautious return to the workplace. Each Maillefer facility implements actions accordingly. Read more

COVID-19 - Maillefer's Cautious Return

FPO / FTU 14 Pay-off and Take-up

27.5.2020

New in low voltage cable production: Maillefer's new FPO / FTU 14 Pay-off and Take-up. Read more

FPO / FTU 14 Pay-off and Take-up

CMB Cutter is a Welcome Arrival for Accurate Tube Lengths

22.5.2020

Maillefer's new CMB 32 cutter is specially designed to consistently deliver lengths of medical or automotive tubes. Read more

CMB Cutter is a Welcome Arrival for Accurate Tube Lengths

BICC BERCA Secures Capacity for World-class Production

13.5.2020

Maillefer installed BICC BERCA's 1st CV extrusion line in the 90’s and ensured smooth and fast project realization through several upgrades. Read more

BICC BERCA Secures Capacity for World-class Production

Share by email