Change country to:

Search results

Quick Conductor Splicing Value Package for MV CV Lines

Our Quick Conductor Splicing Value Package allows quick conductor splicing for compact round stranded medium voltage (MV) conductors up to 800 mm².

Do you want faster and more reliable conductor splicing in your XLPE insulation process

Quick conductor splicing in just 1 - 2 minutes

With our Quick Conductor Splicing Value Package there is no need to slow down the line for reel change. Splicing can be done during the pay-off reel change. In addition a shorter pay-off accumulator or only one pay-off is needed, and absolutely no line stops will occur due to conductor splice breaks.

What you get

Quick and reliable conductor splicing during pay-off reel change

  • Splicing know-how and drawings for precise specially designed conductor splicing sleeves
  • A crimping table arrangement with a conductor guide, a clamp and a hydraulic crimping machine

New lines compatible with Quick Conductor Splicing Value Package for MV CV Lines

Meet us at Chinaplas in on 03 - 07 August, 2020!

Wire & Tube China

Read more

IWCS

Wire India

Read more

Wire Düsseldorf

Read more

From our blog Visit Blog

Stop by our booth

8.4.2020

Stop by at a Maillefer booth at any of the industry events during 2020. Read more

Stop by our booth

COVID-19 - Stay Safe and Keep Healthy

2.4.2020

The global crisis has temporarily changed Maillefer’s way of serving W&C & P&T manufacturers. We adapt daily according to the situation as it develops. Read more

COVID-19 - Stay Safe and Keep Healthy

Monitoring Towards Excellence

25.3.2020

In the context of Industry 4.0, Maillefer introduces Smart Monitoring as a novel and intuitive approach into the wire, cable, pipe and tube manufacturing environments. Read more

Monitoring Towards Excellence

Increase Engineering Support for Your Future Plant Project

19.3.2020

Construction of new facilities or important expansions of existing ones all begin with a promising idea. Are you ready to face the project challenges and the unexpected? Read more

Increase Engineering Support for Your Future Plant Project

COVID-19 - A Challenge to Overcome

18.3.2020

The evolving global health crisis, which we all face, is temporarily causing Maillefer to adapt its operations, sales and service response teams. Read more

COVID-19 - A Challenge to Overcome

Castello Increases Flexibility to Deliver through Smart Monitoring

4.3.2020

Castello relies on an advanced and controlled process to produce tubes with high quality. The recently installed Smart Monitoring from Maillefer provides the Italian company with necessary oversight for quality Read more

Castello Increases Flexibility to Deliver through Smart Monitoring

Multipurpose Lines Help Lead the Way for PP Cable

28.2.2020

One of the new trends in power cable manufacturing is the rise of PP (polypropylene) based thermoplastic materials for the medium voltage application. Currently, these cables are predominantly XLPE and rubber, but now advances in material development make it possible to also consider thermoplastics. Read more

Multipurpose Lines Help Lead the Way for PP Cable

Run Times Reach New Heights

26.2.2020

The performance of extruded high voltage XLPE insulated cables is improvable by reducing the degassing burden and realizing longer extrusion run times. Development towards those goals was rendered possible after years of close technical collaboration with material suppliers and cable manufacturers. Read more

Run Times Reach New Heights

Share by email